Q:How many photovoltaic piles or steel sheet piles can be driven in a day (or an hour) under normal conditions (6m, 9m, 12m)?
A:If the soil conditions are good, a 6-meter photovoltaic pile can be driven in about 10 minutes. Steel sheet piles can be driven even faster.
Q:What is the maximum weight of piles that can be lifted for driving?
A:It depends on the excavator's tonnage. For 20-30 ton excavators, it can lift and drive 2-3 tons. For 30-40 ton excavators, it can handle 3-4-5 tons. Heavier piles may require the assistance of a crane, and the excavator should be equipped with additional counterweights accordingly.
Q:Is it easy to replace parts, such as bearings?
A:It is very convenient and easy. Just open the bearing cover on the gearbox and push it out. (A replacement video guide is provided.)